• Skip to main content
  • Skip to footer
  • Home
  • About
    • MyPE Copyright Terms
    • Authors
    • Deals
  • Info
    • Accommodation
    • Classified Adverts
    • Directory
    • Essential PE Numbers
    • Flight Schedules
    • Forex Converter
    • PE’s Online Radio Stations
      • Algoa FM
      • Bay FM
      • iFM
      • Kingfisher FM
      • MannMade Radio
      • Madibaz Radio
      • Umhlobo Wenene
    • Podcasts
    • Shipping
    • Street Map
    • Tides
    • Ward Details
    • Ward News
    • Weather
  • Contact
    • Advertising on MyPE
  • Submit
    • Blogger
    • 5 Quick PE Questions
    • Entertainment
    • Events
      • Add your Port Elizabeth event
    • Letter to the Editor
    • Lost and Found
    • Movers and Shakers
    • News Article
    • PE Videos
    • Photographs
    • Recipes
    • Traffic Hooligan
    • Say NO
  • Dam Levels
  • Advertorial
  • Business
  • NMBRA
  • NMB Rates
MyPE

MyPE

Community Business Directory, Event Listings, News and Views from Gqeberha, Nelson Mandela Bay

Solar PV Installation Time Lapse

11 March 2015 By Port Elizabethan

The first phase Solar Photovoltaic installation of Solar Panels on the roof of Magnetic Storm in Port Elizabeth.

The Solar System installed by Straton Solar at Magnetic Storm is a 7 Kw, 8.5kW peak Hybrid system which offers Grid Tie and Battery Backup for essential circuits such as Servers, Desktop computers and lights.

Technical details are that the system is a Conext XW+ Grid interactive inverter from Schneider Electric which Straton Solar are the Eastern Cape Distributors for, along with 20 x 250 W Yingli Solar Panels, mounted at 30 degrees, with 495 Amp Hours of 48 Volt battery backup. The system will supply Magnetic Storm with power from the grid, from the solar panels, from the batteries and from an optional generator.

On present load the installed battery backup will give Magnetic Storm 5 hours of backup – more than the worst case load shedding projections. This backup projection is based on draining the battery bank to 50%.

The installation is projected to generate 6 876 KW Hours per annum.

This hybrid system is Phase 1 of Magnetic Storm’s green drive.

Phase 2 will see the installation of a 25 KW pure grid tie system with 27 KW’s of solar panels with a projected yield of 41 518 units per annum.

Magnetic Storm are making the right decision based on hard cold numbers and being Environmental Champions.

Installation by Straton Solar – http://straton.co.za/solar

Creator: Alan Straton
Posted to MyPE by: Alan Straton

Submit your favourite Port Elizabeth, Uitenhage and Despatch videos for consideration for publication on MyPE by filling in the form below:

  • This field is for validation purposes and should be left unchanged.
  • Click on the share icon on the video (top right hover) and paste the LINK here. It will look something like this: http://vimeo.com/72605056
  • Who uploaded/created the Vimeo video?
  • Click the Share hyperlink below the YouTube Video. Copy and paste THAT url here. It will start with http://youtu.be/

Click here to see more PE Videos.

The following two tabs change content below.
  • Bio
  • Latest Posts

Port Elizabethan

This author is a 'catch-all' for occasional articles and letters written to MyPE. The Author of each article can be found in the signature at the bottom of each individual article.

Latest posts by Port Elizabethan (see all)

  • Why Fewer People Are Being Convicted for Commercial Crimes - 15 May 2026
  • Urgent Call for South Africa to Support and Join Global Efforts to Phase Out Fossil Fuels - 15 April 2026
  • Unfenced 6 SAI Army Base Outside Makhanda Claims Another Life - 20 November 2025
  • Death Toll Rises From Makhado Bus Crash - 21 October 2025
  • Law Clinics Flooded as Home Affairs Blocks Asylum Seekers From the System - 15 October 2025

Filed Under: Business, PE Videos Tagged With: mynmb, port elizabeth, solar, straton, video, vimeo, youtube

Reader Interactions

Comments

  1. Alan says

    11 March 2015 at 12:59 pm

    The section of this time lapse with little movement is the time period when the Solar Panels are fetched and placed before being loaded up on the roof!

Footer

RSS Straton Electrical

  • Open Cycle Gas Turbine Usage
  • Flattening the curve – What Every Solar Installer Needs to Know
  • Why you shouldn’t leave a charger plugged in when not in use
  • How do I check if an Electrician is properly registered in South Africa?
  • Easy Electrical Troubleshooting for Humans
  • Water – If You Cannot Measure It Then You Cannot Manage It
  • Tips To Survive Loadshedding
  • Eskom’s Top 50 Electricity Saving Tips

RSS MyPE Business News

  • NMBBC On Budget 2025
  • Leading Business Minds Set to Headline Chambers Annual General Meeting
  • Bay of Opportunity Portal
  • Bay of Opportunity Ambassadors Programme to Promote the Bay and Attract Investment
  • 6 Decades of Trucking
  • Thermal Camera Installed at Redhouse Substation
  • Finalist in the 2025 South African Car of the Year
  • Joining hands to create a lasting impact to St Albans Primary School

RSS MyPR Press Releases

  • Amogelang Tatai and Glenrose Xaba Claim Elite Titles at 2026 Boxer Super Run Durban
  • ByThis Adds a Sublimation Mug and Tumbler Kit for South African Makers Ahead of the Year-End Gifting Rush
  • Cockroach Problems in Flats Can Need a Building-Wide Response
  • Urine Odours Feature in Gqeberha Carpet/Rug Cleaning Work Throughout the Year
  • The Work Before the Carpet Machine Starts Matters, Says Local Cleaner

How you may use MyPE content © 2026 MyPE · Gqeberha, South Africa | Privacy Policy | MyPE Ads and Media Kit