• Skip to main content
  • Skip to footer
  • Home
  • About
    • MyPE Copyright Terms
    • Authors
    • Deals
  • Info
    • Accommodation
    • Classified Adverts
    • Directory
    • Essential PE Numbers
    • Flight Schedules
    • Forex Converter
    • PE’s Online Radio Stations
      • Algoa FM
      • Bay FM
      • iFM
      • Kingfisher FM
      • MannMade Radio
      • Madibaz Radio
      • Umhlobo Wenene
    • Podcasts
    • Shipping
    • Street Map
    • Tides
    • Ward Details
    • Ward News
    • Weather
  • Contact
    • Advertising on MyPE
  • Submit
    • Blogger
    • 5 Quick PE Questions
    • Entertainment
    • Events
      • Add your Port Elizabeth event
    • Letter to the Editor
    • Lost and Found
    • Movers and Shakers
    • News Article
    • PE Videos
    • Photographs
    • Recipes
    • Traffic Hooligan
    • Say NO
  • Dam Levels
  • Advertorial
  • Business
  • NMBRA
  • NMB Rates
MyPE

MyPE

Community Business Directory, Event Listings, News and Views from Gqeberha, Nelson Mandela Bay

NMB Residents can now buy Pre-paid electricity at 76 retail shops across the Metro – NMBM

2 June 2022 By Port Elizabethan

Published: 01 Jun 2022 CURRENT


UPDATE ON SHUTDOWN BY ESKOM THAT MAY CAUSE WATER DISRUPTIONS.

The power supply at Nooitgedagt was restored at around 03:00 AM and the plant was then restarted.

The plant has since been on full production and storage levels throughout the Metro are gradually increasing.

Many areas are affected and therefore, residents will notice water supply returning from now until Friday.

Residents are urged not to stockpile water during the recovery period as this places a strain on the system and will result in an even longer recovery time.

Water trucks have been deployed to the below locations:

1) Roaming in Gelvandale

2) Hunters Retreat Spar

3) Kenako Mall

4) Sherwood Spar

5) Roaming in KwaZakhele/Zwide Tonjeni

6) Kamma Crossing Mall

7) Roaming in Malabar

8) Roaming in Helenvale

9) Roaming Hillside

We thank residents for their continued patience and apologize for the inconvenience caused.

Published: 31 May 2022 CURRENT


PLANNED SHUTDOWNS MAY CAUSE WATER DISRUPTIONS IN PARTS OF THE CITY.

In an effort to reduce water leaks in the Metro, planned maintenance shutdowns will be taking place this week.

1. June 1, 2022.

Joe Slovo West

2. June 2, 2022.

Veeplaas – Konyana Street PRV

It is envisaged that water supply will be shut off between the hours of 08:00 and 16:00.

Residents and businesses are encouraged to please use water sparingly during this time period.

We apologize for the inconvenience caused.

Published: 31 May 2022 CURRENT



UPDATE ON SHUTDOWN BY ESKOM THAT MAY CAUSE WATER DISRUPTIONS.

The Municipality wishes to update residents that power supply should return between 21h00 and 22h00 this evening.

Eskom has reported that the work is taking longer than expected. Residents that are currently consuming water are drawing it from the reticulation system. This means the system is depleting and will therefore take longer to fill once the power is restored to Nooitgedagt Treatment Works.

We apologize for the inconvenience caused.

Published: 30 May 2022 CURRENT


PLANNED SHUTDOWNS MAY CAUSE WATER DISRUPTIONS IN PARTS OF THE CITY.

The Municipality wishes to inform residents that a number of shutdowns are planned for the following reservoir zones.

Glendinning Reservoir:

1. Meters & Valves (Inlets) – Wednesday, June 1, 2022.

2. Meters & Valves (Outlets) – Tuesday, June 21, 2022.

Areas that may be affected include:

1. Kensington

2. Millard Grange

3. Mount Croix

4. North End

5. Part of Sydenham

6. Prince Alfred’s Park

7. Part of New Brighton

These areas fall within Wards 5, 7, 15.

Fort Nottingham Reservoir:

1. Meters & Valves (Inlets) – Tuesday, June 7, 2022.

2. Meters & Valves (Outlets) – Tuesday, June 14, 2022.

Areas that may be afffected incude:

1. Macleanville

2. Parsons Hill

3. Kensington

4. Millard Grange

5. Prince Alfred’s Park

These areas fall within Wards 5 and 7.

Fairview Reservoir:

1. Meters & Valves (Inlets) – Thursday, June 2, 2022.

2. Meters & Valves (Outlet) – Thursday, June 23, 2022.

Areas affected would include:

1. Korsten

2. Holland Park

3. Steytler Township

4. Macleanville

5. Adcockvale

6. Sydenham

7. Neave industrial

8. Part of new Brighton

These areas fall within Wards 7, 10, 11, 14 and 15.

The above planned shutdowns are essential to the integration of groundwater supply into these reservoirs.

Residents and businesses are encouraged to please use water sparingly during this time period.

More NMBM News.

The following two tabs change content below.
  • Bio
  • Latest Posts

Port Elizabethan

This author is a 'catch-all' for occasional articles and letters written to MyPE. The Author of each article can be found in the signature at the bottom of each individual article.

Latest posts by Port Elizabethan (see all)

  • Why Fewer People Are Being Convicted for Commercial Crimes - 15 May 2026
  • Urgent Call for South Africa to Support and Join Global Efforts to Phase Out Fossil Fuels - 15 April 2026
  • Unfenced 6 SAI Army Base Outside Makhanda Claims Another Life - 20 November 2025
  • Death Toll Rises From Makhado Bus Crash - 21 October 2025
  • Law Clinics Flooded as Home Affairs Blocks Asylum Seekers From the System - 15 October 2025

Filed Under: Government Tagged With: nmbm

Footer

RSS Straton Electrical

  • Open Cycle Gas Turbine Usage
  • Flattening the curve – What Every Solar Installer Needs to Know
  • Why you shouldn’t leave a charger plugged in when not in use
  • How do I check if an Electrician is properly registered in South Africa?
  • Easy Electrical Troubleshooting for Humans
  • Water – If You Cannot Measure It Then You Cannot Manage It
  • Tips To Survive Loadshedding
  • Eskom’s Top 50 Electricity Saving Tips

RSS MyPE Business News

  • NMBBC On Budget 2025
  • Leading Business Minds Set to Headline Chambers Annual General Meeting
  • Bay of Opportunity Portal
  • Bay of Opportunity Ambassadors Programme to Promote the Bay and Attract Investment
  • 6 Decades of Trucking
  • Thermal Camera Installed at Redhouse Substation
  • Finalist in the 2025 South African Car of the Year
  • Joining hands to create a lasting impact to St Albans Primary School

RSS MyPR Press Releases

  • Concentrix South Africa Recognised for Talent, Innovation and Leadership at CapeBPO and BPESA Awards
  • Mpumalanga School Gets a Major Makeover Through Reinhardt’s Community Upliftment Initiative
  • Winning Koesister Recipe Gets a Festive Rooibos Twist
  • AMN Unveils Multi-Band, Multi Technology Radio Node to Accelerate Low-Cost Telecom Rollouts
  • D’vine Skin & Body Answers the Key Questions About Dermapen Microneedling

How you may use MyPE content © 2026 MyPE · Gqeberha, South Africa | Privacy Policy | MyPE Ads and Media Kit