
A stop – go operation will be in place for the duration of the closure of the one lane, whilst the drill rig is being moved from Produce Street to Lower Valley Road. Traffic Control vehicles with yellow warning lights will be in the front and rear of the pile rig, together with flagmen in front and rear of pile rig to warn oncoming traffic.
While the drill rig of Franki Pile is drilling, there will be short closures of one lane in Lower Valley Road for about half an hour while concrete is being poured in each pile. The drill rig is expected to finish all work on either Monday 25 February 2019, or Tuesday 26 February 2019.
The MBDA says that they are hoping to keep the disruption of traffic in Lower Valley Road to a minimum, and all traffic control measures will be put in place.
Alan Straton
Latest posts by Alan Straton (see all)
- Decor Handles Spotlights Its Solid Brass Door Handles From Portugal and Italy - 14 November 2026
- PaperTrail Puts a Risk Score on Every Contract With Scout AI - 14 November 2026
- Pay@ Puts Automatic Reconciliation at the Centre of Year-End Collections - 13 November 2026
- Renal Supplies Water Systems Plans Dialysis RO Plants From Tap to Drain - 13 November 2026
- MoreCut Saws in Alrode Welds Bandsaw Blades to the Length Your Saw Needs - 13 November 2026
